Weighing The Decision
Early in 1998, Sunrise designed and performed construction administration for an original three barrel, low profile concrete box culvert to be placed in the Santa Cruz Wash in Chino Valley, Arizona, which is approximately eight miles north of Prescott. The unique culvert which was designed to handle 9,220 cubic feet of water per second featured 4-ft X 16-ft openings with 12-inch concerete walls.